KYIV. Ukraine Gate , 28 , May , 2022 | Wae News.
Due to constant rocket and artillery shelling by the Russian occupiers, Slavyanskaya TPP, the main structural unit of PJSC Donbasenergo, has stopped operating. This was reported by Donbasenergo .
Quote
“In recent days, the Mykolayiv City Territorial Community of the Donetsk Region, where the main structural unit of PJSC Donbasenergo, Slovyanskaya TPP, is located, is constantly under rocket and artillery fire from the Russian occupation forces,” the statement said.
Details
It is noted that the personnel of the power plant constantly during the active phase of the war heroically provided the operation of generating equipment and the supply of electricity to the power system of Ukraine.
“In order to save the lives and health of the station staff, as well as in connection with the need to evacuate employees and their families, PJSC” Donbasenergo “decided to suspend the Slavic TPP on May 27, 2022,” – said in a statement. .
Let’s add
As of May 1, 2022, 60.86% of the shares of PJSC Donbasenergo belong to the Private Joint-Stock Company ENERGOINVEST HOLDING, 25% + 1 share belongs to the state represented by the State Property Fund of Ukraine.
PJSC Donbasenergo unites two power plants: Slavyanska and Starobeshivska TPPs (the latter has been located in the territory not controlled by Ukraine since 2014). Since March 2017, the indicators of production activity of assets located in the temporarily occupied territory of Donetsk region are not included in the consolidated financial statements of Donbasenergo due to the loss of control over them.
Addition
Earlier it was reported that the intensity of enemy shelling has increased in the Donetsk region .
Source: Ukrgate